Skip to main content
CallQuoteQuote
A Bell 407 sits on the grass beside its long-line rigging.

Part 133

External-load work with our Bell 407

We fly external-load work under Part 133 with our Bell 407.

Published November 6, 2026.

How we fly external-load work under Part 133

Part 133 is the Federal Aviation Administration’s rule for rotorcraft external-load operations, and we fly this work under it with our Bell 407. A passenger trip and a lift are different jobs on different agreements, even though both are flown on the Bell 407.

What we need to know to plan your lift

Tell us what has to move, where it is picked up and where it has to be set down, along with your dates and how the crew reaches the site. You do not need every number on the first call, so tell us what has been weighed and what has not.

A cargo-hook rating does not tell you what this aircraft can lift at your site, so we look at performance, the equipment installed, the shape and weight of the load, the weather, and the flight path together. Permissions and the plan on the ground are settled before anyone commits to the lift.

We also provide storm recovery support

When a storm has passed, send us the site and the conditions, and we plan our support from the work in front of you.

Questions clients ask us

Which helicopter flies the external load?

We fly external-load work with the Bell 407.

Does the hook rating tell me what you can lift at my site?

No. The load, the site, the weather, and the equipment decide the job together.

Do you do storm recovery work?

Yes. We provide storm recovery support, and we plan it from the site and the conditions you send us.

We confirm the capacity and the date of each lift for the job you bring.

Sources
  1. 14 CFR Part 133, Rotorcraft External-Load Operations